Machinery Manufacturing

Hebei Xinda Machinery Co., Ltd. | Air Compressor/Pump Predictive Maintenance

Hebei XX Machinery Plant | 12 Air Compressors/Pumps Predictive Maintenance

01

Pain Points

12 critical power equipment units (8 air compressors, 3 pumps, 1 fan) rely on manual inspection, averaging 2.3 unplanned shutdowns per month with ~¥4,000 loss per incident. No equipment operating baseline data; "run-to-failure" maintenance mode with high spare parts inventory costs.

02

Implementation Plan

Monitoring Targets

Vibration, temperature, current, runtime, and start/stop frequency of air compressors, pumps, and fans

Pilot Scope

First batch: 12 critical equipment units covering all production line power equipment

Tech Stack

Equipment Status Monitoring (Industrial/Electromechanical)Factory Equipment Monitoring & Alerting SystemIoT Intelligent Monitoring & Alerting System

Pilot Acceptance Criteria

  • Device online rate ≥ 95% (daily heartbeat statistics)
  • Normal operating baseline established per device (7 consecutive days of normal data modeling)
  • Degradation trend alerts traceable to specific time windows
  • Alert-to-work-order closed-loop duration measurable
03

Results

12 unitsConnected Devices
↓ 62%Downtime Reduced
↓ 80%Inspection Reduced
Bearing degradation trend detected 2 weeks in advance, preventing 3 unplanned shutdownsAdvance Warning
From 2-hour human discovery → AI 4-hour early warningResponse Time
Air compressor load rate optimized, saving 11.5% on electricityEnergy Saved

Key Highlights

  • Customer: Hebei Xinda Machinery Co., Ltd. (100-500 employees, metal parts manufacturing)
  • Deployment: March 2026, 7-day deployment cycle
  • Deployment cost: ¥18,600 (sensors, gateway, installation & debugging)
  • Monthly unplanned downtime reduced from 2.3 to 0.5 incidents (= pre-pilot 90 days vs post-pilot 90 days)
  • Downtime reduction 62% = pre-pilot 90-day unplanned downtime vs post-pilot 90-day unplanned downtime
  • Inspection personnel reduced from 4 to 1 person/day, annual labor cost savings ~¥36,000
  • Maintenance shifted from reactive repair to planned maintenance — spare parts inventory cost down 30%
  • Annual estimated savings: ~¥87,000 (downtime loss reduction + energy savings + labor savings)
  • ROI: ~2.5 months payback

Want to achieve the same results?

Share your site details and we'll assess the best-fit monitoring solution with a pilot opportunity.